OPTIMIZACIÓN DE LOS SISTEMAS DE ACUEDUCTO RURAL DE LA VEREDA EL ALMENDRO; SECTOR EL SILENCIO; Y SAN MARTÍN; MEDIANTE LA
ALCALDIA SAN PABLO DE BORBUR tender for Education, worth $61.9M, published in August 2026.
Sign-up only
See who won, the status and the award date.
A free account shows the winner. The status and the award date come with the US$19 3-day pass or a subscription.
Sign up free →Free account · cancel anytime
Contract description
OPTIMIZACIÓN DE LOS SISTEMAS DE ACUEDUCTO RURAL DE LA VEREDA EL ALMENDRO; SECTOR EL SILENCIO; Y SAN MARTÍN; MEDIANTE LA COMPRA DE TANQUES DE ALMACENAMIENTO CON CAPACIDAD DE 10.000 Y 5.000 LITROS; ASÍ COMO LA ADQUISICION DE LOS ACCESORIOS Y DEMÁS COMPONENTES REQUERIDOS PARA EL FORTALECIMIENTO DE LA CAPACIDAD DE ALMACENAMIENTO; REGULACIÓN; ABASTECIMIENTO Y MEJORAMIENTO DE LAS REDES DE LOS SISTEMAS D
Other tenders · ALCALDIA SAN PABLO DE BORBUR
The buyer's full award list ranked by value, with the winning supplier, date and sector on every row — plus CSV / API export.
Winners and award dates are hidden on the public page. Sign up free to see them →
- ocds-secop-CO1.PCCNTR.9838339$20.9M20 Aug 2026 Healthcare
- ocds-secop-CO1.PCCNTR.9838201$9.8M20 Aug 2026 Healthcare
- ocds-secop-CO1.PCCNTR.9837303$191M20 Aug 2026 Construction
Sign-up only
See who won, the status and the award date.
A free account shows the winner. The status and the award date come with the US$19 3-day pass or a subscription.
Sign up free →Free account · cancel anytime